Overview
of the FIDIC Contracts |
|
| |
-
Conditions of Contract for Construction
-
Conditions of Contract for Plant and Design-Build
- Conditions
of Contract for EPC Turnkey Projects
-
Conditions of Contract for EPC Turnkey Project
|
| |
-
Allocation of functions, particularly design
-
Allocation of risks
-
Methods of payment
-
Measurement
|
| |
- Choosing
the right procurement method
|
| 1145 |
The
roles of the Employer and the Engineer |
|
| |
-
Employer's financial arrangements
-
Payment
-
Duties and authority of the Employer and the Engineer
-
The changed role of the Engineer
-
Determinations
|
| 1330 |
The
role of the Contractor |
|
| |
-
Contractor's principal risks
- Quality
assurance
-
Progress reports
- Contractor's
operations on site
|
| 1530
|
Risk,
responsibility, liability, insurance |
|
| |
- Principles
of risk and risk allocation
- Responsibility
-
Liability: scope, extent and period
- Indemnity
and insurance
|
| |
- The
contractor's obligation
- Extensions
of time for completion
- Acceleration
- Penalties
for delay
|
Day
two
| |
- Contractor's
claims: clause 20 procedure
- Employer's
claims
- Unforeseeable
physical conditions
- Prolongation
and disruption
|
| 0945 |
Procedure
for variations and evaluation |
|
| |
- Right
to vary
- Value
engineering
- Variation
procedure
- Evaluation
|
| 1045 |
Design-Build
and Turnkey Contracting |
|
| |
- Design
responsibility
- Fitness
for purpose
- The
Employer's requirements
- Instructions
and variations in the EPC contract
|
| |
- The
FIDIC 1999 Yellow Book
|
| 1330
|
Disputes
and their resolution (1) |
|
| |
- The
Disputes Adjudication Board "DAB"
- The
Terms of Appointment: A Tri-Partite Contract
- The
Procedural Rules
|
| |
- Taking
over and commissioning
- Defect
notification period
- Suspension
and termination
|
| 1515 |
Disputes
and their resolution (2) |
|
| |
- Amicable
settlement
- Arbitration
under the ICC Rules
- Key
points to successful arbitration
|
|
|